CABLE INSTALLATION
Underground Conduit Installation
Review duct routes and condition, manholes, existing cables and working space for underground cable installation.
SITE CONDITIONS
Sites we can discuss
We review cable entry and exit conditions, manhole positions, interference with existing cables and loads along the route when discussing underground duct installation.
- 01New underground duct installations
- 02Additional cables in existing underground ducts
- 03Cable removal and reinstallation
APPROACH
From site conditions to installation
Review duct conditions
Check the duct route, length and diameter, cable specifications and known duct condition.
Check duct passage
Use a duct test device to check whether crushing or sharp bends during ELP duct installation have obstructed the passage.
Plan the work
Consider the route and cable weight when positioning drums and equipment, then agree the scope and schedule.
FIELD RECORDS
Work in the field
Preparing underground cable pulling connections
Related projects
Information to prepare for a consultation
- Ducts
- Provide the route, length, diameter and known duct condition.
- Entry and exit sections
- We review manhole positions, interference with existing cables, and space for drums and equipment.
- Cable and schedule
- Provide cable specifications and weight, whether this is a new installation, expansion or reinstallation, and preferred dates.
FAQ
Frequently asked questions
Please share the duct route, length and diameter, cable specifications, manhole locations, working space and access conditions.
The route, bends, current duct condition, cable access and equipment positioning need to be reviewed. Include known duct conditions in your enquiry.
Distance alone is not enough for an accurate quote. Pricing and scope are discussed after reviewing the route and site conditions.